Sunee Meeting Notebook For Work With Sticky Tabs - 160 Pages, A4 Size Project Planner, Spiral Meeting Agenda/Minutes Notebook Or

Sunee Meeting Notebook For Work With Sticky Tabs - 160 Pages, A4 Size Project Planner, Spiral Meeting Agenda/Minutes Notebook Or

Sale price  $24.10 Regular price  $34.43
Skip to product information
Sunee Meeting Notebook For Work With Sticky Tabs - 160 Pages, A4 Size Project Planner, Spiral Meeting Agenda/Minutes Notebook Or

Sunee Meeting Notebook For Work With Sticky Tabs - 160 Pages, A4 Size Project Planner, Spiral Meeting Agenda/Minutes Notebook Or

Sale price  $24.10 Regular price  $34.43
Free Standard Shipping Across USA
SKU: WBOFFB0BJDNB8HZ
Brand: Sunee
Availability: Out of Stock
Payment methods
  • Amazon
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Sold by Selectfurniturestore, an authorized reseller.

Returns accepted within 30 days  |  support@selectfurniturestore.com

✓ Verified
Shipping Information
  • Free Standard Shipping — United States only
  • Processing Time: 3–5 business days
  • Estimated Delivery: 6–10 business days after dispatch
  • Heavy items are freight-shipped & carefully secured to prevent damage
  • Tracking number sent via email once dispatched
  • Orders over $250 require signature upon delivery. Taxes calculated at checkout.
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Item must be unassembled & in original packaging

All returns require a Return Authorization (RA) number before sending.
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm, including wood dust, formaldehyde, and certain lacquers or finishes.

www.P65Warnings.ca.gov
🪑

Assembly & Weight Safety

Always follow the included assembly instructions. Ensure all bolts and fittings are fully tightened before use. Do not exceed the stated maximum weight capacity.

Keep children away during assembly. Inspect hardware periodically and re-tighten as needed.

ℹ️

Material & Finish Notice

Wood tones and fabric colors may vary slightly from images due to natural material variation and screen calibration. Surface finishes may require periodic maintenance to preserve appearance and longevity.

Made with care

Great value

Elegant design

Quality materials

Description

Meeting Notebook With Action Items: 1.Meeting Planning: Date, Location, Title & Attendees 2.Notes Area 3.Meeting Agenda: Discussion Items & Meeting Duration 4.Action Items: Action Steps, Person, Due Date & Check Box 5.Next Meeting: Date, Time & Location 6.Index Page: Date, Title, Page Number, Which Will Help Create More Effective Meetings And Good Results. Premium Quality Notebook For Work: Golden Spiral Binding Is Sturdy And Flexible, With Easy-To-Turn Pages. Hot-Stamped Cover Is Water-Resistant And Not Easy To Bend. Elastic Closure Band And Back Pocket Keep The Project Planner Organized And Not Flimsy At All. Round Corner Design Prevents Paper From Curling. Perfectly Hold Up Well To Frequent Transfers In And Out Of Backpacks, Briefcases, And Cars. Fight Ink-Bleeding & Great Size: The High-End 100Gsm Paper Could Prevent Ink Bleeding Through Or Feathering, Handle Double-Sided Writing And Most Daily Use Pens Pretty Well. Mark And Identify The Important Sections With The Included 5 Packs Of Multi-Color Labels. The Office/Business Work Notebook Measures 8.5'X 11'(Similar To A4 Size), Generous Size Provides Ample Space To Jot Down Your Meeting Notes. Bonus Notes Pages In The Back: Extra 56 College Ruled Pages In The Back Provide Space For Note Taking, And With The Date Section At The Top For Tracking Them. With 100 Pages For Meeting Minutes, The Manager Notebook Will Cover More Than Half A Year, Even In Daily Use. Also Provides Index Pages For Organizing This Office Planner. Better Tool Drives Better Meetings: The Hassle Of Organizing The Chaotic Meeting Notes Vs This Professional Meeting Notebook. Definitely A Step Up! Everything Is Neatly Zoned On Each Page Makes It A Breeze To Fill Them Out And Ensure All You Need Are Accounted For. Each Meeting Journal Comes In Exclusive Protective Packaging And Accompanying By Our Client Service Commitment To Your Utmost Satisfaction.

You may also like!

Explore More!!!

Shoe Cabinets
Shoe Cabinets

Shoe Cabinets

Armoires
Armoires

Armoires

TV Stands & Media Furniture
TV Stands & Media Furniture

TV Stands & Media Furniture

Desk Chairs
Desk Chairs

Desk Chairs

Why Shop With Us?

Free Shipping in USA*
15 Day Return Policy
Modern & Stylish Designs
Best Price Guarantee
Trusted & Verified
Since 2010

Selectfurniture

Modern & Stylish Designs

Helping homes look beautiful for over a decade.
Bringing style, comfort, and quality to every space.